Convincing solution for Bern

The winning project from the international architectural competition presents an impressive solution for the challenging site and is the most suitable option for further processing and realisation. The winning team, Schmidlin Architekten (Zurich and Engadine), took the chance to connect a contemporary museum building with the Stettler Building and design an architectural ensemble that is well integrated into the UNESCO City of Bern.
The project envisages replacing the Atelier 5 building (extension), which is in urgent need of renovation, with an attractive, free-standing replacement building made of sandstone. The architectural independence of the Stettler Building (old building) will be restored at the same time. The bistro and office space will be located in the adjacent building at Hodlerstrasse 6. Setting the new building back will create a museum square that emphasises the three buildings as an ensemble and links the museum with the public space as effectively as possible. A wide outdoor staircase between the Stettler Building and the new building will lead down to the new Aare terrace, a public space that can be used for picnics and art education, among other things.

“The winning project stands out thanks to its urban character in the UNESCO perimeter and its modern, self-assured architectural language. The jury was won over by the distinct nature of the new building as a solitary structure that leaves the Stettler Building entirely separate, and the inclusion of the building at Hodlerstrasse 6 in the ensemble. With the creation of a square on Hodlerstrasse and the opening up of the slope of the Aare River, the project creates clear added value for the city and gives Kunstmuseum Bern an attractive, inviting address.”
Thomas Hasler, President of the Jury
What happens next
In September 2025, the Cantonal Parliament of Bern approved the project loan by a large majority, thereby provided the necessary funds to further develop and specify the winning project. A committee has launched a referendum against this decision. If enough signatures are collected, a cantonal vote on the Cantonal Parliament's decision will take place in 2026.
The project work will be suspended until the decision of the voting population.
Reasons for the renewal
Whether building services equipment, air conditioning and cooling systems, fire protection or exhibition rooms: the Kunstmuseum lacks a modern, sustainable infrastructure. In some cases, operation is only possible with special permits.
Read moreWhat the museum will offer in the future
Bright and airy exhibition rooms enhance art appreciation. You can look forward to an inviting entrance to the building, spacious mediation rooms, attractive food service options and spaces you’ll enjoy spending time in.
Read moreFinanced through a collaborative effort
The museum renovation renewal is also a joint effort when it comes to financing, too: It is to be financed through public sector funds, private patrons, foundations and businesses.
Read more






